Skip to content
Letting Checks for UK landlords

A landlord’s duty

Electrical safety for landlords: EICR, PAT and the rules

What landlords must do about electrical safety: five-yearly EICRs, the 28-day remedial rule, PAT testing, costs, and how Wales, Scotland and Northern Ireland differ.

An electrician working on domestic wiring
An electrician working on domestic wiring. Photo: Audy of Course / Pexels
How often
At least every five years
Who can do it
Qualified electrician
Rules checked
30 October 2026

Guides on electrical safety

Landlords in England must have the electrical installation in every rented home inspected and tested by a qualified person at least every five years, and must give tenants and, on request, the council a copy of the report. Wales, Scotland and Northern Ireland have their own versions of the same five-year rule. This page is the starting point for all of it.

Who has to have an EICR?

The duty falls on the landlord whenever a tenant has the right to occupy a property as their only or main residence and pays rent. That covers single lets, flats, houses in multiple occupation and licences to occupy. The 2025 amendments extended the same regulations to social landlords in England from 1 November 2025, and the government’s guidance now covers private and social rented housing together.

The regulations do not apply to every arrangement. The government guidance lists the exclusions: shared accommodation with the landlord or the landlord’s family, long leases (including shared ownership), student halls of residence, hostels and refuges, care homes, hospitals and hospices, other healthcare accommodation, and mobile homes, caravans and boats. Communal areas of a building are outside the regulations too, although councils can act on unsafe communal wiring under other housing law.

The first inspection came due before a new tenancy started or, for existing tenancies, by 1 April 2021. The question today is not whether you need one, but when your current one runs out. Our guide to how long an EICR lasts covers expiry dates, new tenancies and what triggers a fresh inspection. The renewal calendar keeps the date in view.

What does an EICR actually cover?

An EICR is a report, not a certificate. It records the condition of the fixed electrical installation at the time of the inspection: the consumer unit, wiring, sockets, switches, light fittings, earthing and bonding, and permanently connected equipment such as showers. It tests the installation against BS 7671, the Wiring Regulations, and sets out its findings as coded observations. It does not test your tenant’s appliances, or the fridge and kettle you supplied; that is a separate question, covered below under PAT testing.

The electrician must record the extent of the inspection and any limitations, and give a clear overall verdict of satisfactory or unsatisfactory, plus the date of the next inspection. Electrical Safety First’s Best Practice Guide 4 sets out the standard that electricians are expected to follow, and our guide to the report’s grading system, EICR codes C1, C2, C3 and FI, explains each code.

What happens after an unsatisfactory report?

If the report shows that further investigative or remedial work is required, a qualified person must complete it within 28 days of the inspection, or sooner if the report says. C1 (danger present), C2 (potentially dangerous) and FI (further investigation) items need action; C3 (improvement recommended) does not. Once the work is done, you must obtain written confirmation from the qualified person and give it, with the report, to your tenants and the council within 28 days of completion.

The rest of the paperwork is simple but easy to forget. The tenant gets a copy within 28 days of the inspection, a new tenant gets one before they move in, a prospective tenant gets one within 28 days of a written request, and the council gets one within 7 days of its written request. You keep the report until the next inspection and hand it to the next inspector.

Who can carry out an EICR?

The regulations say a “qualified person”, which the 2025 amendments define as someone competent to carry out the inspection and testing and any follow-up work. The guidance does not name a mandatory register. In practice, you evidence competence by choosing an electrician registered with a full-scope competent person scheme (NICEIC and NAPIT are two of the operators on the government list), who holds public liability and professional indemnity insurance and has relevant experience. The government guidance points landlords to the Registered Competent Person Electrical register, the Electrical Safety Roundtable and the Electrical Safety First finder.

Terraced houses in a UK street
Most private lets fall within the five-year inspection rule. Photo: Boys in Bristol Photography / Pexels

Our professional finder is the quickest way to compare registered electricians in your area, and the cost guide below has a checklist for spotting a poor report.

How much does electrical safety compliance cost?

These are guide prices from cost guides we read, not quotes we collected. The full breakdown, by property size and region, plus what is and is not included in the fee, is in our guide to EICR certificate cost. If you have several flats, ask for a portfolio price.

For private landlords in England, there is no specific law that requires PAT testing (portable appliance testing). The National Residential Landlords Association says it is not required by law in general, but that landlords must keep electrical equipment safe, and that PAT testing is a common way to show they have. The one place it can become a legal requirement is a licence condition: if your property is covered by a selective, mandatory or additional licensing scheme, check whether the council requires it.

Practice is stricter than the minimum. The NRLA’s advice is to test appliances you supply at least once a year as best practice, pointing to the HSE’s guidance on maintaining portable electrical equipment (HSG107) for suggested frequencies. New appliances normally do not need testing, but a visual check before use is sensible. PAT testing is also a separate service from an EICR and is priced separately.

The position is different in Scotland, where the Repairing Standard covers appliances the landlord supplies. Those should be inspected and, where required, tested, and tenant-owned appliances are excluded. Social landlords in England now have a duty to have equipment they supply checked at least every five years too. If you let in Wales or Northern Ireland, check the official guidance for your nation, since the regulations summarised on this page deal with the fixed installation.

What about smoke and carbon monoxide alarms?

Alarms sit in a different set of rules from the fixed wiring, with their own requirements and their own checks. Our guide to the smoke and carbon monoxide alarm rules sets them out. For an overview of every certificate a landlord may need, see the landlord certificates checklist, and the compliance checker tells you which apply to your property.

Do Wales, Scotland and Northern Ireland have different rules?

Yes. All three use a five-year cycle, but the legislation, the paperwork and the consequences differ.

NationLawFrequency and key detail
EnglandElectrical Safety Standards in the Private Rented Sector (England) Regulations 2020At least every 5 years or sooner; remedial work in 28 days; copies to tenants and council; penalty up to £40,000
WalesRenting Homes (Fitness for Human Habitation) (Wales) Regulations 2022A valid report is required for each period of occupation, valid for 5 years or less; copy to the contract-holder within 14 days; no valid report means the dwelling is treated as unfit for human habitation
ScotlandRepairing Standard (Housing (Scotland) Act 2006)Inspection before the tenancy and at intervals of no more than 5 years; landlord-supplied appliances in scope
Northern IrelandElectrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024At least every 5 years; new tenancies from 1 April 2025, existing tenancies by 1 December 2025; breach is an offence

What are the penalties for breaking the rules?

In England the council enforces the regulations. If it has reasonable grounds to believe you are in breach, it can serve a remedial notice, and the guidance says it can arrange urgent remedial action with the tenant’s consent after at least 48 hours’ notice. It can also impose a financial penalty of up to £40,000, which is the maximum after the 2025 amendments raised it from £30,000. You have 28 days to make representations and can appeal to the First-tier Tribunal (Property Chamber).

A landlord who can show they took all reasonable steps to comply is not in breach. A tenant who refuses access is a typical example, and the regulations say you need not start court proceedings to prove you made an effort. In Wales a dwelling without a valid report is treated as unfit for human habitation, and in Northern Ireland failure to comply is an offence the council can prosecute or deal with by fixed penalty notice.

Where to start

  • Work out your date. Find the next inspection date on your current report and add it to the renewal calendar.
  • Understand the report. Read EICR codes C1, C2, C3 and FI before you speak to your electrician.
  • Check the price. Compare quotes against the ranges in EICR certificate cost.
  • Find a registered electrician. Use the professional finder.

This guide explains the rules as published on 30 October 2026; for a specific property, check with your local council or a qualified professional.

Questions landlords ask

Is an EICR a legal requirement for landlords?

In England, yes. A private landlord must have the electrical installation inspected and tested by a qualified person before a tenancy starts and at least every five years, or sooner if the report says. Wales, Scotland and Northern Ireland also require five-yearly electrical checks under their own legislation. Owner-occupiers have no legal duty, though NICEIC recommends one every ten years.

How much does an EICR cost?

Published price guides we read in October 2026 put a standard EICR at typically £100 to £300, with a two or three bedroom house outside London usually falling between £120 and £250. London and the South East are dearer, and remedial work is extra. See our EICR certificate cost guide for tables by property size and region.

Is PAT testing a legal requirement for private landlords?

In England no specific law requires PAT testing for private lets, according to the National Residential Landlords Association, although a property licence may make it a condition. It remains a common way to show appliances you supply are safe. In Scotland the Repairing Standard covers landlord-supplied appliances, so check the rules for your nation.

What is the penalty for not having an EICR?

In England a council can impose a financial penalty of up to £40,000 and can serve a remedial notice requiring the work to be done. A landlord who took all reasonable steps to comply has a defence. In Northern Ireland, breach is an offence that can lead to prosecution or a fixed penalty notice.

Who can carry out an EICR?

A qualified person: someone competent to inspect and test the installation under BS 7671. The regulations do not require a specific scheme, but choosing an electrician registered with a full-scope competent person scheme such as NICEIC or NAPIT, who holds insurance and has relevant experience, is the usual way to show competence.

Sources, checked on 30 October 2026

  1. GOV.UK: Electrical safety standards in the private and social rented sectors (guidance)
  2. legislation.gov.uk: Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020
  3. legislation.gov.uk: Electrical Safety Standards in the Private Rented Sector (England) (Amendment) Regulations 2025 (SI 2025/1043)
  4. legislation.gov.uk: Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022, regulation 6
  5. Gov.scot: Repairing Standard statutory guidance, electrical installations and appliances
  6. Department for Communities (NI): Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024
  7. Electrical Safety First: Best Practice Guide 4, Electrical installation condition reporting (Issue 7.4)
  8. NRLA: Portable Appliance Testing (PAT) guidance
  9. NICEIC: Electrical Installation Condition Reports (householders)